Bloomington Brokaw substation interconnection queue

1 active project totaling 300 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Bloomington Brokaw as the point of interconnection, all in IL.

1active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3216 Not reported n/r 300 Battery Active
J3467 Not reported n/r 200 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.