BLACKFOOT - MADRID substation interconnection queue

3 active projects totaling 1,902 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4 MISO queue filings name BLACKFOOT - MADRID as the point of interconnection, all in MI.

3active projects
1,902active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3799 Not reported 345 1,452 Gas Active
J3362 Not reported 345 300 Battery Withdrawn
J2139 Not reported 345 250 Hybrid Active
J2485 Not reported 345 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.