Substation Scout

Bison Substation substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

5 MISO queue filings name Bison Substation as the point of interconnection, all in Cass County, ND.

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1613 Not reported 345 400 Wind Withdrawn
J1109 Not reported 345 207 Wind Withdrawn
J1170 Not reported 345 200 Solar Withdrawn
J743 Not reported 345 200 Wind Withdrawn
J946 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first