Big Stone South substation substation interconnection queue

2 active projects totaling 500 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name Big Stone South substation as the point of interconnection, all in Grant County, SD.

2active projects
500active MW
4total filed
Queue IDProjectkVMWResourceStatus
J4135 Not reported 345 450 Wind Withdrawn
J4081 Not reported 345 250 Battery Active
J4153 Not reported 345 250 Battery Active
J4149 Not reported 345 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.