Substation Scout

Big Stone South - Ellendale line substation interconnection queue

2 active projects totaling 300 MW in the MISO queue.

2 MISO queue filings name Big Stone South - Ellendale line as the point of interconnection, all in Codington County, SD.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
J436 Not reported 345 150 Wind Operational
J437 Not reported 345 150 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first