Substation Scout

Big Stone South - Alexandria substation interconnection queue

3 active projects totaling 900 MW in the MISO queue.

3 MISO queue filings name Big Stone South - Alexandria as the point of interconnection, all in MN.

3active projects
900active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3384 Not reported 345 300 Wind Active
J3669 Not reported 345 300 Solar Active
J3886 Not reported 345 300 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first