Substation Scout

Big Stone - Brookings substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Big Stone - Brookings as the point of interconnection, all in Deuel County, SD.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J638 Not reported 345 204 Wind Withdrawn
J637 Not reported 345 98 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first