Bastrop Tap substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Bastrop Tap as the point of interconnection, all in Morehouse Parish, LA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1933 Not reported 115 100 Solar Withdrawn
J2011 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.