Substation Scout

Barron substation interconnection queue

2 active projects totaling 280 MW in the MISO queue.

2 MISO queue filings name Barron as the point of interconnection, all in Barron County, WI.

2active projects
280active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1808 Not reported 161 200 Solar Active
J3198 Not reported n/r 80 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.