at new Tap on proposed MVP Big Stone to Ellendale line substation interconnection queue

1 active project totaling 151.8 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name at new Tap on proposed MVP Big Stone to Ellendale line as the point of interconnection, all in Grant County, SD.

1active projects
151.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
J488 Not reported 345 151.8 Wind Operational
J489 Not reported 345 151.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.