0 active projects
totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
3 MISO queue filings name Astoria as the point of interconnection, all in Deuel County, SD.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
J2546
Not reported
345
185
Wind
Withdrawn
J2003
Not reported
345
150
Solar
Withdrawn
J2005
Not reported
345
75
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.