Arpin substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Arpin as the point of interconnection, all in Wood County, WI.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2559 Not reported n/r 200 Solar Active
J1510 Not reported 345 100 Solar Withdrawn
J2557 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.