Arnold Substation substation interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E0009 | Linn County Generating Facility | 161 | 675.5 | Nuclear | Withdrawn |
| J397 | Not reported | 138 | 153 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.