Substation Scout

Arnold - Perkins Line Tap substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Arnold - Perkins Line Tap as the point of interconnection, all in Marquette County, MI.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1251 Not reported 138 100 Solar Active
J1252 Not reported 138 20 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first