0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3 MISO queue filings name Argenta - Tompkins Line Tap as the point of interconnection, all in Calhoun County, MI.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1459 Not reported 345 670 Gas Withdrawn
J936 Not reported 345 535 Gas Withdrawn
J937 Not reported 345 535 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.