ARGENTA - TALLMADGE substation interconnection queue

2 active projects totaling 370 MW in the MISO queue.

2 MISO queue filings name ARGENTA - TALLMADGE as the point of interconnection, all in MI.

2active projects
370active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1663 Not reported 345 200 Solar Active
J2786 Not reported 345 170 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.