Substation Scout

Anson Substation substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Anson Substation as the point of interconnection, all in Minnehaha County, SD.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
H025 Not reported n/r 200 Wind Withdrawn
J189 Not reported n/r 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.