Andes Substation substation interconnection queue

2 active projects totaling 370 MW in the MISO queue.

2 MISO queue filings name Andes Substation as the point of interconnection, all in Madison County, MS.

2active projects
370active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4154 Not reported n/r 200 Battery Active
J3764 Not reported 230 170 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.