Substation Scout

Amberg - Plains substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Amberg - Plains as the point of interconnection, all in Dickinson County, MI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3641 Not reported 138 100 Solar Withdrawn
J3638 Not reported 138 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first