Substation Scout

AECC WYNNE EAST - PARKIN substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name AECC WYNNE EAST - PARKIN as the point of interconnection, all in Cross County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3570 Not reported 161 300 Solar Withdrawn
J3783 Not reported 161 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first