AECC WYNNE EAST - PARKIN substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name AECC WYNNE EAST - PARKIN as the point of interconnection, all in Cross County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J3570
Not reported
161
300
Solar
Withdrawn
J3783
Not reported
161
200
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.