Substation Scout

AECC Dell - Nucor-Yamato Switching Station substation interconnection queue

1 active project totaling 70 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name AECC Dell - Nucor-Yamato Switching Station as the point of interconnection, all in Mississippi County, AR.

1active projects
70active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3580 Not reported 161 250 Battery Withdrawn
J3271 Not reported 161 230 Solar Withdrawn
J2871 Not reported 161 70 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first