Substation Scout

AECC CAMDEN SOUTH - STEPHENS substation interconnection queue

2 active projects totaling 330 MW in the MISO queue.

2 MISO queue filings name AECC CAMDEN SOUTH - STEPHENS as the point of interconnection, all in Ouachita County, AR.

2active projects
330active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4134 Not reported 115 200 Hybrid Active
J2818 Not reported 115 130 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.