5STODDARD - 5MORLEY (AECI) substation interconnection queue

2 active projects totaling 356 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name 5STODDARD - 5MORLEY (AECI) as the point of interconnection, all in MO.

2active projects
356active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3690 Not reported 161 300 Battery Withdrawn
J2524 Not reported 161 200 Solar Active
J3442 Not reported 161 156 Solar Active
J3906 Not reported 161 140 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.