5ADAIR - 5THMHIL (AECI) substation interconnection queue

1 active project totaling 115 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name 5ADAIR - 5THMHIL (AECI) as the point of interconnection, all in Randolph County, MO.

1active projects
115active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3411 Not reported 161 120 Solar Withdrawn
J2382 Not reported 161 115 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.