MISO request S1120

MISO queue ID S1120

Queue request S1120 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW hybrid project in Knox County, IN, according to Berkeley Lab’s queue data file. The filing names Edwardsport - Washington Mun as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 15, 2027.

Queue IDS1120
Project nameNot reported
Status (as published)Active
SubstationEdwardsport - Washington Mun
Point of interconnectionEdwardsport - Washington Mun
CountyKnox
StateIN
VoltageNot reported
Capacity150 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-07-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Knox, IN: 23 requests in the MISO queue, 14 active totaling 2,010 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
Project typeGeneration
Queue date2025-09-08
Components (hybrid)Solar 150 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first