Substation Scout

Surplus; J1102

MISO queue ID S1048

Surplus; J1102 (S1048) was listed in the MISO interconnection queue at the end of 2025 as a 40 MW hybrid project in Logan County, IL, according to Berkeley Lab’s queue data file. The filing names Fogarty Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2025.

Queue IDS1048
Project nameSurplus; J1102
Status (as published)Active
SubstationFogarty Substation
Point of interconnectionFogarty Substation 138kV
CountyLogan
StateIL
Voltage138 kV
Capacity40 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fogarty Substation substation: 3 requests in the MISO queue, 2 active totaling 110 MW.

Queue IDProjectMWResourceStatus
J1102Not reported70SolarActive
J034Not reported175WindWithdrawn

Logan, IL: 11 requests in the MISO queue, 5 active totaling 561.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
Project typeGeneration
Queue date2023-10-30
Components (hybrid)Other 40 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first