Surplus; J1304
MISO queue ID S1035
Surplus; J1304 (S1035) was listed in the MISO interconnection queue at the end of 2025 as a 33 MW hybrid project in Rock County, WI, according to Berkeley Lab’s queue data file. The filing names Townline Rd. - Paddock as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2023.
| Queue ID | S1035 |
|---|---|
| Project name | Surplus; J1304 |
| Status (as published) | Active |
| Substation | Townline Rd. - Paddock |
| Point of interconnection | Townline Rd. - Paddock 138kV |
| County | Rock |
| State | WI |
| Voltage | 138 kV |
| Capacity | 33 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2023-07-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rock, WI: 26 requests in the MISO queue, 15 active totaling 2,594.1 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMERICAN TRANSMISSION COMPANY |
|---|---|
| Project type | Generation |
| Queue date | 2022-08-15 |
| Components (hybrid) | Other 33 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.