Surplus; Gratiot Solar

MISO queue ID S1019

Surplus; Gratiot Solar (S1019) was listed in the MISO interconnection queue at the end of 2025 as a 50 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Redstone as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2023.

Queue IDS1019
Project nameSurplus; Gratiot Solar
Status (as published)Active
SubstationRedstone
Point of interconnectionRedstone 138kV
CountyNot reported
StateNot reported
Voltage138 kV
Capacity50 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2023-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2022-04-25
Components (hybrid)Solar 50 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.