Surplus; Gratiot Solar (S1019) was listed in the MISO interconnection queue at the end of 2025 as a 50 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Redstone as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2023.
| Queue ID | S1019 |
|---|---|
| Project name | Surplus; Gratiot Solar |
| Status (as published) | Active |
| Substation | Redstone |
| Point of interconnection | Redstone 138kV |
| County | Not reported |
| State | Not reported |
| Voltage | 138 kV |
| Capacity | 50 MW |
| Resource (as published) | Solar+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2023-09-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | METC |
|---|---|
| Project type | Generation |
| Queue date | 2022-04-25 |
| Components (hybrid) | Solar 50 MW + Other |