Surplus; J947
MISO queue ID S1017
Surplus; J947 (S1017) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Tennyson as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2023.
| Queue ID | S1017 |
|---|---|
| Project name | Surplus; J947 |
| Status (as published) | Active |
| Substation | Tennyson |
| Point of interconnection | Tennyson 138kV |
| County | Not reported |
| State | Not reported |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2023-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMERICAN TRANSMISSION COMPANY |
|---|---|
| Project type | Generation |
| Queue date | 2022-04-11 |
| Components (hybrid) | Other 100 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.