Surplus; Merricourt Solar
MISO queue ID S1014
Surplus; Merricourt Solar (S1014) was listed in the MISO interconnection queue at the end of 2025 as a 49.9 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Merricourt Wind as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.
| Queue ID | S1014 |
|---|---|
| Project name | Surplus; Merricourt Solar |
| Status (as published) | Active |
| Substation | Merricourt Wind |
| Point of interconnection | Merricourt Wind 230kV |
| County | Not reported |
| State | Not reported |
| Voltage | 230 kV |
| Capacity | 49.9 MW |
| Resource (as published) | Solar+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-09-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MONTANA-DAKOTA UTILITIES CO. |
|---|---|
| Project type | Generation |
| Queue date | 2022-03-09 |
| Components (hybrid) | Solar 49.9 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.