Surplus; J893 (Searcy Solar)
MISO queue ID S1000
Surplus; J893 (Searcy Solar) (S1000) was listed in the MISO interconnection queue at the end of 2025 as a 10 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Searcy Price Sub as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | S1000 |
|---|---|
| Project name | Surplus; J893 (Searcy Solar) |
| Status (as published) | Active |
| Substation | Searcy Price Sub |
| Point of interconnection | Searcy Price Sub 161kV |
| County | Not reported |
| State | Not reported |
| Voltage | 161 kV |
| Capacity | 10 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Searcy Price Sub substation: 2 requests in the MISO queue, 2 active totaling 110 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J893 | Not reported | 100 | Solar | Operational |
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Entergy |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2020-06-20 |
| Operational date | 2022-01-21 |
| Components (hybrid) | Other 10 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.