Substation Scout

MISO request R39

MISO queue ID R39

Queue request R39 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW wind project in O'brien County, IA, according to Berkeley Lab’s queue data file. The filing names Raun - Lakefield Junction as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 25, 2015.

Queue IDR39
Project nameNot reported
Status (as published)Operational
SubstationRaun - Lakefield Junction
Point of interconnectionRaun - Lakefield Junction
CountyO'brien
StateIA
VoltageNot reported
Capacity500 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2015-05-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

O'brien, IA: 6 requests in the MISO queue, 2 active totaling 750 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Optional
Queue date2007-03-08
Interconnection agreement date2009-08-28
Operational date2015-12-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.