MISO request R35

MISO queue ID R35

Queue request R35 was listed in the MISO interconnection queue at the end of 2025 as a 80 MW wind project in Calhoun County, IA, according to Berkeley Lab’s queue data file. The filing names Pomeroy Wind Farm site as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2008.

Queue IDR35
Project nameNot reported
Status (as published)Operational
SubstationPomeroy Wind Farm site
Point of interconnectionPomeroy Wind Farm site
CountyCalhoun
StateIA
VoltageNot reported
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2008-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calhoun, IA: 3 requests in the MISO queue, 2 active totaling 92 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2000-01-01
Interconnection agreement date2015-05-04
Operational date2008-11-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.