Substation Scout

Replacement; Oak Creek Units 5-8

MISO queue ID R1053

Replacement; Oak Creek Units 5-8 (R1053) was listed in the MISO interconnection queue at the end of 2025 as a 1,138 MW gas project in Milwaukee County, WI, according to Berkeley Lab’s queue data file. The filing names Elm Road as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 30, 2027.

Queue IDR1053
Project nameReplacement; Oak Creek Units 5-8
Status (as published)Active
SubstationElm Road
Point of interconnectionElm Road
CountyMilwaukee
StateWI
VoltageNot reported
Capacity1,138 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-05-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Milwaukee, WI: 3 requests in the MISO queue, 3 active totaling 2,738 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
Project typeGeneration
Queue date2024-06-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first