Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2

MISO queue ID R1052

Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 (R1052) was listed in the MISO interconnection queue at the end of 2025 as a 615 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names "18CAMPBELLW‚Äù, ‚Äú18CAMPBELLB as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2028.

Queue IDR1052
Project nameReplacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2
Status (as published)Active
Substation"18CAMPBELLW”, “18CAMPBELLB
Point of interconnection"18CAMPBELLW”, “18CAMPBELLB
CountyNot reported
StateNot reported
VoltageNot reported
Capacity615 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Interconnection serviceERIS
Project typeGeneration
Queue date2024-06-24
Components (hybrid)Other 615 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.