Substation Scout

Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa

MISO queue ID R1029

Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa (R1029) was listed in the MISO interconnection queue at the end of 2025 as a 37 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Joppa Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2024.

Queue IDR1029
Project nameReplacing 37 MW of natural gas generation with BESS at Joppa; Joppa
Status (as published)Active
SubstationJoppa Switchyard
Point of interconnectionJoppa 161kV Switchyard
CountyNot reported
StateNot reported
Voltage161 kV
Capacity37 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Queue date2022-12-12
Components (hybrid)Other 37 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first