Replacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar

MISO queue ID R1016

Replacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar (R1016) was listed in the MISO interconnection queue at the end of 2025 as a 124.4 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Bailey substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 10, 2023.

Queue IDR1016
Project nameReplacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar
Status (as published)Active
SubstationBailey substation
Point of interconnectionBailey 161kV substation(338879)
CountyNot reported
StateNot reported
Voltage161 kV
Capacity124.4 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2023-05-10
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS INC.
Interconnection serviceNRIS
Project typeGeneration
Queue date2022-02-18
Operational date2024-10-04
Components (hybrid)Solar 124.4 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.