MISO request J888

MISO queue ID J888

Queue request J888 was listed in the MISO interconnection queue at the end of 2025 as a 25 MW gas project in George County, MS, according to Berkeley Lab’s queue data file. The filing names Benndale Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 22, 2019.

Queue IDJ888
Project nameNot reported
Status (as published)Operational
SubstationBenndale Substation
Point of interconnectionBenndale 69kV Substation
CountyGeorge
StateMS
Voltage69 kV
Capacity25 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2019-07-22
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

George, MS: 2 requests in the MISO queue, 1 active totaling 25 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION
ClusterDPP-2017-AUG South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2019-08-19
Operational date2019-07-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.