Queue request J864 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW solar project in Richland County, WI, according to Berkeley Lab’s queue data file. The filing names Lone Rock Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2022.

Queue IDJ864
Project nameNot reported
Status (as published)Operational
SubstationLone Rock Substation
Point of interconnectionLone Rock 69kV Substation
CountyRichland
StateWI
Voltage69 kV
Capacity50 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Richland, WI: 1 request in the MISO queue, 1 active totaling 50 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAmerican Transmission Co.
ClusterDPP-2017-AUG East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2020-04-27
Operational date2022-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.