MISO request J535

MISO queue ID J535

Queue request J535 was listed in the MISO interconnection queue at the end of 2025 as a 210 MW wind project in Sac County, IA, according to Berkeley Lab’s queue data file. The filing names J411 √¢‚Ǩ‚Äú Lehigh Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2020.

Queue IDJ535
Project nameNot reported
Status (as published)Operational
SubstationJ411 – Lehigh Line
Point of interconnectionJ411 – Lehigh 345kV Line
CountySac
StateIA
Voltage345 kV
Capacity210 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2020-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sac, IA: 2 requests in the MISO queue, 1 active totaling 210 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-FEB West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2015-11-16
Interconnection agreement date2018-12-20
Operational date2020-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.