MISO request J469

MISO queue ID J469

Queue request J469 was listed in the MISO interconnection queue at the end of 2025 as a 2 MW project in Crawford County, MI, according to Berkeley Lab’s queue data file. The filing names Consumers Grayling Generation Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2017.

Queue IDJ469
Project nameNot reported
Status (as published)Operational
SubstationConsumers Grayling Generation Substation
Point of interconnectionConsumers Grayling Generation 46 kV Substation
CountyCrawford
StateMI
Voltage46 kV
Capacity2 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2017-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Crawford, MI: 1 request in the MISO queue, 1 active totaling 2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG East (ITC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2015-06-30
Interconnection agreement date2017-02-28
Operational date2017-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.