MISO request J443
MISO queue ID J443
Queue request J443 was listed in the MISO interconnection queue at the end of 2025 as a 41 MW wind project in Delaware County, IA, according to Berkeley Lab’s queue data file. The filing names Greely Tap as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2018.
| Queue ID | J443 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Greely Tap |
| Point of interconnection | Greely Tap |
| County | Delaware |
| State | IA |
| Voltage | Not reported |
| Capacity | 41 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2018-04-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Delaware, IA: 2 requests in the MISO queue, 2 active totaling 82 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2015-AUG West |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | DPP - SIS |
| Queue date | 2015-05-06 |
| Interconnection agreement date | 2017-05-22 |
| Operational date | 2018-04-01 |