MISO request J3955
MISO queue ID J3955
Queue request J3955 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Lac Qui Parle County, MN, according to Berkeley Lab’s queue data file. The filing names Big Stone South - Deuel County as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2030.
| Queue ID | J3955 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Big Stone South - Deuel County |
| Point of interconnection | Big Stone South - Deuel County 345.0kV |
| County | Lac Qui Parle |
| State | MN |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2030-06-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Big Stone South - Deuel County substation: 2 requests in the MISO queue, 2 active totaling 500 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J3960 | Not reported | 300 | Wind | Active |
Lac Qui Parle, MN: 2 requests in the MISO queue, 2 active totaling 500 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OTTER TAIL POWER COMPANY |
|---|---|
| Cluster | DPP Cycle Pending West |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-04-08 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.