MISO request J3918

MISO queue ID J3918

Queue request J3918 was listed in the MISO interconnection queue at the end of 2025 as a 138.4 MW wind project in Champaign County, IL, according to Berkeley Lab’s queue data file. The filing names 4RANTOUL - 4RISING as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDJ3918
Project nameNot reported
Status (as published)Active
Substation4RANTOUL - 4RISING
Point of interconnection4RANTOUL - 4RISING 138.0kV
CountyChampaign
StateIL
Voltage138 kV
Capacity138.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

4RANTOUL - 4RISING substation: 2 requests in the MISO queue, 1 active totaling 138.4 MW.

Queue IDProjectMWResourceStatus
J3483Not reported137.4WindWithdrawn

Champaign, IL: 15 requests in the MISO queue, 8 active totaling 1,264.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-02-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first