MISO request J3907

MISO queue ID J3907

Queue request J3907 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Stark County, IL, according to Berkeley Lab’s queue data file. The filing names 4BUREAU - 4EKEWANEE N as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDJ3907
Project nameNot reported
Status (as published)Active
Substation4BUREAU - 4EKEWANEE N
Point of interconnection4BUREAU - 4EKEWANEE N 138.0kV
CountyStark
StateIL
Voltage138 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Stark, IL: 2 requests in the MISO queue, 2 active totaling 500 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.