MISO request J3897

MISO queue ID J3897

Queue request J3897 was listed in the MISO interconnection queue at the end of 2025 as a 60 MW solar project in Knox County, IN, according to Berkeley Lab’s queue data file. The filing names Gibson Sta - Bedford 345 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2030.

Queue IDJ3897
Project nameNot reported
Status (as published)Active
SubstationGibson Sta - Bedford 345
Point of interconnectionGibson Sta - Bedford 345 345.0kV
CountyKnox
StateIN
Voltage345 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Gibson Sta - Bedford 345 substation: 5 requests in the MISO queue, 5 active totaling 700 MW.

Queue IDProjectMWResourceStatus
J4063Not reported300WindActive
J2566Not reported200SolarActive
J3896Not reported70SolarActive
J3925Not reported70SolarActive

Knox, IN: 23 requests in the MISO queue, 14 active totaling 2,010 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-02-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.