Substation Scout

MISO request J376

MISO queue ID J376

Queue request J376 was listed in the MISO interconnection queue at the end of 2025 as a 1,270 MW gas project in Union County, AR, according to Berkeley Lab’s queue data file. The filing names El Dorado substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 15, 2016.

Queue IDJ376
Project nameNot reported
Status (as published)Operational
SubstationEl Dorado substation
Point of interconnectionEl Dorado substation
CountyUnion
StateAR
VoltageNot reported
Capacity1,270 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2016-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Union, AR: 17 requests in the MISO queue, 7 active totaling 3,140 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-AUG South
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2014-07-07
Interconnection agreement date2015-05-27
Operational date2016-12-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.