Substation Scout

MISO request J3756

MISO queue ID J3756

Queue request J3756 was listed in the MISO interconnection queue at the end of 2025 as a 4.2 MW gas project in Marquette County, MI, according to Berkeley Lab’s queue data file. The filing names Huron as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 21, 2019.

Queue IDJ3756
Project nameNot reported
Status (as published)Active
SubstationHuron
Point of interconnectionHuron
CountyMarquette
StateMI
VoltageNot reported
Capacity4.2 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2019-01-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marquette, MI: 17 requests in the MISO queue, 5 active totaling 444.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP-2023 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first