Substation Scout

MISO request J3645

MISO queue ID J3645

Queue request J3645 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Huron County, MI, according to Berkeley Lab’s queue data file. The filing names RAPSON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.

Queue IDJ3645
Project nameNot reported
Status (as published)Active
SubstationRAPSON
Point of interconnectionRAPSON
CountyHuron
StateMI
VoltageNot reported
Capacity150 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

RAPSON substation: 3 requests in the MISO queue, 3 active totaling 500 MW.

Queue IDProjectMWResourceStatus
J2628Not reported250BatteryActive
J3485Not reported100BatteryActive

Huron, MI: 41 requests in the MISO queue, 29 active totaling 4,917.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP-2023 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.