Substation Scout

MISO request J3181

MISO queue ID J3181

Queue request J3181 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW hybrid project in Logan County, IL, according to Berkeley Lab’s queue data file. The filing names 4FOGARTY - 4LIMIT as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2027.

Queue IDJ3181
Project nameNot reported
Status (as published)Active
Substation4FOGARTY - 4LIMIT
Point of interconnection4FOGARTY - 4LIMIT 138.0kV
CountyLogan
StateIL
Voltage138 kV
Capacity100 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Logan, IL: 11 requests in the MISO queue, 5 active totaling 561.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 100 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first